» Cavaliere

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8

Installed Capacity (Wp)

  • 0
  • 1
  • 0
  • 1
  • 2
  • 3
  • 4
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 0
  • 1
  • 2
  • 3

Annual Production (MWh)

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 0
  • 1
  • 2

Families Energy needs

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 0
  • 1
  • 2
  • 3
  • 4
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8

Annual Savings (tons)

  • Location: Mesagne (BR)
  • Technology: fixed, ground-based structures
  • EPC and O&M: Enerqos
  • Modules: REC Solar
  • Inverters: PowerOne
  • Commissioning: October 2010
  • Localization: N 40°35’15.58ˮ – E 17°47’16.68ˮ
Cavaliere is one of two power plants in Apulia owned by NextPower 2, and was commissioned in October 2010.
The investment was lease-financed in November 2009 with Leasint.